
Project Introduction:
Changsha Rail Transit Operation Control Center is the operation monitoring center of Changsha Metro Line 1, 2, 3, 4, and 5 and has disaster prevention and emergency command functions. It is the location of the central equipment of the electromechanical system of Line 1, 2, 3, 4, and 5, The podium has 5 floors, the tower has 26 floors, and the basement has 3 floors.
Project Content:
The entire intelligent system includes: 1. Building equipment monitoring system; 2. Intelligent lighting system; 3. Video monitoring system; 4 Access control system; 5. Parking lot system; 6. Intrusion alarm and perimeter prevention system; 7. Construction equipment Integrated management system; 8. Integrated wiring system; 9. Computer data network system; 10. Cable television and three-network information system; 11. Background music and emergency broadcasting system; 12. All-in-one card system\digital conference system; 13. Public information release System; 14. Computer room engineering, etc.