CASE DETAILS

Qingdao Port China Merchants International Container Terminal

CASE DETAILS

timg (2).jpg


Project Introduction:

The planned shoreline length of the Qingdao Port Wharf Project is 2272 meters, and the planned construction scale of the port area is three 100,000-ton level and two 30,000-ton level (water depth and structure according to 50,000-ton level) 5 dedicated container berths in total and two multi-purpose berth of 30,000 tons, with an annual handling capacity of 4.5 million TEUs and 2 million tons of general cargo.


Project Content:

Building video monitoring system, building all-in-one card system, multifunctional integrated conference system, integrated wiring system, central control system, etc.



Tel:0755-86168616
Emailchinaibt@chinaibt.com
Add.:6th Floor, Building 6, Shenzhen Software Park, Keji Middle 2nd Road, High-Tech Zone, Yuehai Sub-District, Nanshan District, Shenzhen
Tel:0755-86168616
QRcode