Project Introduction:
The planned shoreline length of the Qingdao Port Wharf Project is 2272 meters, and the planned construction scale of the port area is three 100,000-ton level and two 30,000-ton level (water depth and structure according to 50,000-ton level) 5 dedicated container berths in total and two multi-purpose berth of 30,000 tons, with an annual handling capacity of 4.5 million TEUs and 2 million tons of general cargo.
Project Content:
Building video monitoring system, building all-in-one card system, multifunctional integrated conference system, integrated wiring system, central control system, etc.